Research studies

Sallie_Harvesting Study_Petersen etal 1974

DRAFT_MPCA_PRWD_Water Quality Assessment of the Upper Pelican River Watershed Clean Water Partnership Program

1998_Campbell Creek Comprehensive Plan

A.W. Research Laboratories_1996_Proposal for the Septic_Point Source Detection Overflight of Big and Little Floyd Lakes

A.W. Research Laboratories_Proposal for a Fall Surveillance Overflight of the Pelican River Watershed District

A.W. Research Laboratories_Proposal for Locating Ground Water in the Wetland just West of Detroit Lake_1996

A.W. Research Laboratories_Proposal for Mapping Sedimentation in Lake Sallie_1995

A.W. Research Laboritories_1996_Proposal for the Aerial Lakeshore Analysis of Floyd Lake

Becker County COLA_2003 Lake Water Quality Management Report

Becker County Overall Economic Development Plan_1965

Blue Water Science_1997 Status Report_Plant Harvesting and Zooplankton Dynamics in Muskrat Lake for 1997

David Robert Lee_1971 Septic Tank Nutrients in Groundwater Entering Lake Sallie, Minnesota

HOUSTON Engineering Inc. 1997 Proposal to Provide Engineering Services for Water and Sanitary Sewer Big Floyd Lake to Detroit Twnshp

Instrumental Research Inc_1983_Watershed_Lake_Assessment

Instrumental Research Inc_1984 Aeration Proposal to Pelican River Watershed District

Instrumental Research Inc_1985_Nutrient Retention of Harvested Aquatic Vegetation from Lakes Sallie and Melissa

Instrumental Research Inc_Proposal For Lake Assessment

Joe K. Neel_Impact of Special Phosphorus Removal Procedures in the Upper Pelican River Watershed, 1977_78

JOE K Neel Impact of Special Phosphorous Removal Procedures in the Upper Pelican River Watershed Interim Report II

JOE K Neel Impact of Spoecial Phosphorus Removal Procedures in the Upper Pelican River Watershed, Becker County MN 1977_80

Joe K. Neel_Weed Harvest and Lake Nutrient Dynamics_1973

Kirk A. Johnson_Butomus umbellatus in Becker County Minnesota_An Investigation into the Control of an Exotic

K-V Associates Inc_1980_Septic Leachate Survey Detroit Lakes Minnesota

Larson_Peterson and Associates_1987_Monitoring Plan_Lakes Sallie and Detroit

Larson_Peterson and Associates_1988_Monitoring Plan_Lakes Sallie and Detroit

Larson_Peterson and Associates_1988_Quality Assurance Plan Lakes Sallie and Detroit

Larson_Peterson and Associates_1990_Clean Lakes Study of Lakes Sallie and Detroit 1988 and 1989 Data Collection Summary

Larson Peterson and Associaties 1992 Diagnostic Feasibility Study Management Alternatives for Lake Sallie and Detroit Lake

Larson_Peterson and Associates_1992_Diagnostic_Management Alternatives for Lake Sallie and Detroit Lake

Larson_Peterson and Associates_2001_Stormwater Drainage Plan_Storm Sewer Drainage Districts_Detroit Lakes Minnesota

Larson_Peterson and Associates_Clean Lakes Program In Lake Monitoring Lake Sallie_1989

Larson Peterson and Ulteig 2004 Wasterwater Treatment Facility Effluent Discharge Feasibility Study_City of Detroit Lakes, MN prelim Engineering Report

McComas_Blue Water Science_1999_Pelican River Watershed District Aquatic Plant Harvesting Program Evaluation

McComas_Blue Water Science_1999_Wetland Aeration for Phosphorus Reduction_Results of Ditch 14 Summer Projects

McComas Blue Water Science 2001 Wetland Ditch Aeration for Phosphorus Inactivation in Ditch 14, Pelican River Watershed District MN

McComas_Blue Water Science_2001_Plant Harvesting and Water Quality Dynamics in Muskrat Lake for 2000

McComas Blue Water Science 2002 Impacts of Ditch Aeration on Bioavailable Phosphorus in Ditch 14, Pelican River Watershed District MN

McComas_Hecock_Nustad_Wilson_An Updated Diagnostic and Feasibility Study for Lake Sallie, Detroit Lakes, MN

McComas_Stuckert_Blue Water Science_1999_Plant Harvesting and Zooplankton Dynamics in Muskrat Lake for 1998

McComas_Pelican River Watershed District Aquatic Plant Harvesting Program Evaluation

R. Hecock_Sallie and Detroit Lakes Feasibility Study_1993

Rieke Carrol Muller Associates Inc 1984 Facilities Plan Addendum Report Lakeview Township MN Evaluation of Land Application by Spray Irrigation

Rieke Carrol Muller Associates Inc 1978 Water Pollution Control Facilities Report for Lakeview Township, Becker County, MN

Rieke Carroll Muller Associates Inc_1981_Wastewater Treatment Facilities Plan Summary Report

Steven W. Iverson_The Pelican River Navigation Restoration Project_1992

Ulteig_North Side Stormwater Treatment Study_UEI Project Number R07.50052

Ulteig_2009_507.052_Part 2

Wenck 1998 Wastewater Treatment and DRinking Water Supply Alternatives Analysis Lake Sallie and Lake Melissa Chain of Lakes

Wenck_2006_Ditch 14 Hydraulic and Water Quality Study

Wenck_2008_Wastewater Treatment and Drinking Water Supply Alternative Analysis Floyd Chain of Lakes

Wenck_Lakeview Township Community Assessment Report_2010

Windseth Smith Nolting 1997 A porposal to Detroit Township to Provide Engineering Services for Wasterwater Facility Plan

Windseth Smith Nolting_1997_Water System Feasibility Study for Big Floyd Lake_Detroit Township_Becker County MN

Windseth Smith Nolting_1998_Wastewater Facility Plan for Big Floyd Lake_Detroit Township_Becker County MN

Wenck Associates Pearl Lake (081512)

Pearl subwatershed map2

Pearl Lake CWP proposal summary_2009

Pearl Lake Diagnostic Study Report_June_2013